The Vegetation Clearance Blog


Contractor scorecards, and where each number on one comes from
The metrics a vegetation contractor is graded on after award: how TRIR and DART are computed and why the formula punishes a small crew, who calculates the experience modification and how to contest it, what a quality pass rate is measured against, and the federal and state evaluation forms that follow a contractor to the next bid.


Unit prices and change orders on a tree contract
How a unit-price bid schedule is built, why the estimated quantity is a comparison device rather than a promise, the two thresholds that reopen a unit price and the tree contracts that carry neither, and what it takes to get a change paid on a California public works contract.


Flow-down clauses: what a prime passes to a sub
The clauses a prime has to push into a subcontract on utility vegetation work, the four conditions in Labor Code section 1775(b), the duties that reach a subcontractor whether or not anyone writes them down, the seven-day payment clocks, and what a second-tier crew cannot borrow from the tier above it.


DBE and small business participation requirements, and who is bound
The two different programs that share the initials DBE, which one reaches utility vegetation management work, the General Order 156 percentages and the $500,000 subcontracting threshold, what a Supplier Clearinghouse certificate takes, and why a California public agency cannot run the same program.


Bonds and insurance limits on a utility vegetation contract
Which bond on a California public works vegetation contract is set by statute and which is set by the buyer, what the payment bond pays and by when, what limits a current line clearance solicitation asks for, and why the certificate of insurance is not the coverage.


How a utility MSA is structured, and what a sub sees of it
What a master service agreement actually contains, why it buys nothing until a purchase order or contract work authorization is issued against it, which document wins when two of them conflict, and the clauses that decide what a second-tier contractor is allowed to read.


Utility prequalification: what evaluators actually check
What California Public Contract Code section 20101 authorizes a public entity to ask a bidder, how the Labor Commissioner's March 2019 model questionnaire separates thirteen pass-or-fail questions from twenty-one scored ones, where the 35-point threshold sits, and why none of it reaches an investor-owned utility.


ISNetworld grades and what an A actually means
Why an ISNetworld grade belongs to one hiring client rather than to the contractor, what PG&E's SAFE-3006S requires of vegetation crews, how the points are assembled on the one hiring-client scorecard published in full, and what ISN says the review does not decide.


What the CSLB C-49 tree and palm classification covers
The two sentences that define California's C-49 contractor classification, why a current license may still read C-61/D-49, who the classification binds on a utility right of way, and what a public agency has to put on the bid form.


Labor Code 1777.5: apprentices on a tree and brush contract
What California Labor Code section 1777.5 requires of a contractor employing workers on a public works vegetation contract, why the answer for tree work turns on whether the craft is apprenticeable, what the DAS 140 and DAS 142 do, and what the missed notice costs per calendar day.


Certified payroll in XML: what a contractor files and when
What California Labor Code section 1771.4 requires a public works contractor to send the Labor Commissioner, what the eCPR XML schema will and will not accept, the two clocks that run on a certified payroll record, and the second weekly payroll that federal money adds.


DIR contractor registration for vegetation work
What Labor Code section 1725.5 requires before a vegetation contractor can bid, be listed or work on a California public works project, where the $15,000 maintenance line falls, what a day of unregistered work costs, and the second registration statute AB 338 opened on July 1, 2026.


DIR prevailing wage on public works vegetation contracts
The two California craft determinations that cover tree work on public works, what separates them, how an asterisk moves the rate under a live contract, and what a misclassified crew costs per worker per day.


SB 901 and the vegetation programs it left behind
What SB 901 added to Public Utilities Code section 8386 in 2018, the four words it wrote about vegetation management, the compliance and funding machinery it built, and where every one of its section numbers sits today.


What Public Utilities Code section 8386 requires
The one duty section 8386 puts on an electrical corporation, the 23 paragraphs a wildfire mitigation plan must contain, the two paragraphs that name contractors, and the subdivision letters that moved on September 19, 2025.


Enhanced Vegetation Management: what the term covers on a scope of work
Enhanced Vegetation Management is a name a utility gives one of its own wildfire mitigation plan activities. What it covers, what unit it is bought in, what closes a unit, and why the same three letters mean different work at PG&E and at Southern California Edison.


What an Energy Safety vegetation audit examines
How the Office of Energy Infrastructure Safety audits utility vegetation management work: the statutory power over work done on a utility's behalf, the three phases and the 30-day corrective action window, and the documentation standard that decides whether an initiative is complete or deficient.


What a utility safety certification requires
The seven conditions in Public Utilities Code section 8389(a), what an electrical corporation files to document each one, the quarterly notification calendar that keeps the certificate alive, and the renumbering that happened on September 19, 2025.


The three-year WMP cycle and what changes between filings
The published calendar a California wildfire mitigation plan moves through, what a revision notice changes, how errata and petitions to amend work, and why the three-year cycle ends with the 2026-2028 plans.


How California utility Wildfire Mitigation Plans work under AB 1054
What AB 1054 put at stake for a California electrical corporation, how the Wildfire Mitigation Plan became the document that protects it, which agency approves the plan and which one approves the money, and where the plan's targets turn into contracted scope.