The Vegetation Clearance Blog


Contract utility foresters: pre-inspection staff augmentation, and what the hour moves
What changes when a vegetation program buys pre-inspector hours instead of circuit miles: who becomes the controlling employer under Labor Code 6400(b), which of the eight essential terms in 29 CFR 103.40 a daily routing practice touches, when the hour carries a prevailing wage, and what the agreement has to name before the first inspector is badged.


Inventories and equipment inspections: the programs beyond the cycle
Four records name the same pole on a vegetation contract: the continuing plant inventory record under 18 CFR Part 101, the GO 165 inspection record, the vegetation inventory nothing specifies, and the daily vehicle report under 49 CFR 396.11. What each one owns, what it cannot answer, and where a scope line confuses them.


New construction and new business: clearing a line before energization
What a vegetation pre-inspection has to produce on a line extension, a new service or a one-off project: the clearance that gates connection, the specification frozen by Public Utilities Code 783, the easement the prescription rests on, and the two accounts the same saw lands in.


Pre-inspecting a distribution cycle and a transmission cycle: what differs
The practical differences between a distribution vegetation pre-inspection and a transmission one: what starts the walk, which calendar governs, what the default prescription is, how far ahead a hazard tree is judged, and what the record has to show on a span where nothing needed work.


The vegetation system of record: working in the utility's, or bringing one
What a utility's own procedure requires of the system its inspectors write into, why no regulation names a platform, what a state auditor actually reads when it audits a vegetation program, and the four questions that decide whose entry is the record when a contractor brings a system of its own.


When a landowner refuses: the inspector's record of the attempt
What a vegetation inspector does and records when a property owner says no: the outcome field, the constraint code, the clock the refusal does and does not stop, the Priority 1 rule that ignores it, and the second log a threat opens under Labor Code 6401.9.


Representing the utility at the property line: authority, limits, the record
Where a contract pre-inspector's authority on private property actually comes from, which field calls a utility procedure reserves to a named utility role, why the California identification statute does not reach the person standing in the yard, and whose record the tablet entry becomes.


Field hazard tree assessment: the level, the trigger, and the call
Which level of tree risk assessment the scope of work bought, what ANSI A300 Part 9 leaves to the specification, the if-then that sends an inspector from the road to the trunk, and the sentence about residual risk almost no distribution record carries.


What a pre-inspection produces: the work order before the crew
The artifact a vegetation pre-inspection hands to the crew: the located vegetation point, the prescription written in inspection cycles, the notification attempts, the constraints, and the documented reason behind every later change to the unit.


Tree removal vs. pruning: how the utility decides
Which prescription a vegetation inspector writes and on what grounds: what General Order 95, PRC 4293 and FAC-003 each say about removal, the one-page removal criteria in PG&E's distribution inspection procedure, and the terms in those criteria that nobody has defined.